- BOQ 导入
- 单价分析
- 预算审批
- 变更申请
- 工单
- 工地日志
- 材料申领
- 工地调拨
- 班组工时表
- 进度账单(RA)
- 付款证书
- 质保金扣留
- 立方体试块试验
- 缺陷清单
- 移交
我们按照您工地现有的运作方式搭建 Odoo —— 您的成本编码、您的供应商、您的审批流程 —— 然后培训您的团队,直到他们无需我们也能独立运行系统。
运作方式
一个项目,六大阶段,一份记录
每个阶段都会承接上一阶段的数据,同样的数字无需重复录入。
ItemDescriptionQtyRateAmount
2.01Excavation in normal soil1,240 m³9,50011,780,000
3.04Concrete C25 in column bases186 m³385,00071,610,000
4.02High-yield steel Y1224,600 kg3,45084,870,000
5.01230 mm blockwork walls3,120 m²38,500120,120,000
7.03Roof sheeting G28 IT41,460 m²32,00046,720,000
Subtotal (TZS)335,100,000
Rate analysis · 3.04 Concrete C25 · per m³Unit rate TZS 385,000
- Materials 248,000
- Labour 52,000
- Plant 34,000
- Overheads and profit 51,000
Materials
Labour
Subcontract
Plant
- Budget
- Committed
- Actual
Budget tracking
- Mbezi Apartments2,412.0
- Block B1,086.0
- Superstructure486.2
- 3.04 Concrete C2571.6
EV712.4
AC685.0
CPI · SPI1.04 · 0.97
EAC1,044.2
Substructure
Frame
Blockwork
Roofing
Finishes
Site diary · Wed 14 Oct 2026Checklist 7 of 9
WeatherLight rain, 27°C
Crew on site46
Slab L380%
ITP-07 · Rebar inspection before pour · hold point awaiting sign-off
4 · 材料
每一袋水泥都有账可查
每张材料申领单从申请到仓库再到楼板,每一步都计入项目成本。
RequisitionFrom the work order, approved
Head-office storeDispatch
TransitOptional two-step
Site storeReceived at site
ConsumptionCharged to the job
MaterialIssuedTheoryWaste
Cement 42.5R (bags)1,2401,1983.5%
Steel Y12 (kg)25,48024,6003.6%
230 mm blocks39,90038,7003.1%
Issued comes from consumption orders. Theoretical comes from the work measured.
Crew timesheet · WO-0318 Slab L3
Masons · 6 × 35,000210,000
Steel fixers · 4 × 30,000120,000
Labourers · 14 × 15,000210,000
To job cost (TZS)540,000
Booked by the foreman. Labourers need no login.
RA bill No. 4 · Kilimanjaro Electrical Ltd
Work done this bill46,800,000
Less retention 10%−4,680,000
Less WHT−2,340,000
Net payable (TZS)39,780,000
Retention held to date 15,920,000
Gross work done to date742,180,000
Less retention 10%−74,218,000
Less advance recovery−111,327,000
Less previously certified−468,410,000
Net this certificate88,225,000
Add VAT 18%15,880,500
Less WHT−4,411,250
Amount payable (TZS)99,694,250
TRA VFD receiptAdvance guarantee to 30 Jun 2027
Element7-day28-dayResult
Slab L223.637.4Pass
Beams L324.136.8Pass
Columns L321.9—21 Oct
NCR-011 · Column C7Honeycombing repairedClosedSnag list12 of 87 open
Block A · handed over 2 Mar 2026DLP 12 months
118 days left
移交后的支持
将缺陷和保修报修登记为工单,通过现场服务任务派遣技术人员,并保留每栋楼每次上门的记录。


Budget used
Cost by site
Mbezi Block B
41%
41%
Kigamboni Warehouse 27%
Dodoma 18%
Arusha 14%
My Budget · Site engineer2 sites · TZS 412.6M
MR-0142 · four-eyesRequested · site engineerApproved · project manager
建筑行业 Odoo
真实的 Odoo 界面,为建筑行业量身配置
建筑 ERP 基于 Odoo 标准的项目、采购、库存和开票模块运行,团队只需使用一套熟悉的系统。
6
个阶段,每个项目一份记录
14
种可直接打印的报表
18%
每份证书自动计算增值税
0
站点与办公室之间的电子表格
本地化设计
为坦桑尼亚量身打造
- TRA VFD 收据
- 18% 增值税
- 预扣税
- 坦先令和美元合同
- 您的团队可使用英语或斯瓦希里语工作
我们需要更改现有的成本编码吗?
不需要。我们会按照您现有的成本编码、BOQ 结构和审批步骤配置系统,然后培训您的团队。
现场工程师可以用手机使用吗?
可以。Odoo 可在手机浏览器中运行,工程师和工长可在工地填写工地日志、班组工时表和材料申领单。每位工程师只能看到自己的工地。
可以从 Excel 导入我们现有的 BOQ 吗?
可以。BOQ 导入功能会把您的 Excel 清单读入项目或子项目,无需任何人重新录入。
支持 TRA VFD 吗?
支持。客户发票通过 Chesify Labs 的 VFD 集成开具 TRA VFD 收据。